ITAC Assessment: MZ0375
ITAC logo
ITAC Assessment: MZ0375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product fabricated structural steel
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 328,000
ft2
Annual Production 12,000
ton
Production Hrs. Annual 4,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,008 2,524,398
kWh
Electricity Demand $39,435 12,814
kW-mo/yr
Natural Gas $21,834 3,934
MMBtu
TOTAL YEARLY COSTS $337,277
RECOMMENDED SAVINGS* $626,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2437: Recover waste heat from equipment $19,447 $22,100 - - $19,447
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,208 $400 $2,053
18,832
kWh
$155
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $1,090 $1,405 $1,090
10,000
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,542 $13,100 $12,542
115,066
kWh
- - -
05 2.7135: Install occupancy sensors $295 $2,100 $295
2,705
kWh
- - -
06 2.7221: Lower temperature during the winter season and vice-versa $4,865 - $3,084
28,296
kWh
- $1,781
-
MMBtu
-
07 2.9114: Use solar heat to make electricty $34,746 $214,502 $33,527
307,589
kWh
$1,219
-
kW-mo/yr
- -
08 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $7,435 $12,750 $6,357
58,320
kWh
$1,078
-
kW-mo/yr
- -
09 2.4321: Upgrade obsolete equipment $544,334 $2,410,000 $6,334
58,114
kWh
- - $538,000
TOTAL RECOMMENDED $626,962 $2,676,357 $65,282
598,922
kWh
$2,452
-
kW-mo/yr
$21,228
-
MMBtu
$538,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs