ITAC Assessment: NT0035
ITAC logo
ITAC Assessment: NT0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Structural steel beams
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 30,000
ft2
Annual Production 7,500
ton
Production Hrs. Annual 2,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,607 748,200
kWh
Electricity Demand $54,804 4,770
kW-mo/yr
Electricity Fees $7,499 -
Waste Disposal Costs
Water Usage $1,000 73
Tgal
TOTAL YEARLY COSTS $122,909
RECOMMENDED SAVINGS* $161,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,196 $5,609 $1,205
15,122
kWh
$991
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $954 - $524
6,571
kWh
$431
-
kW-mo/yr
- -
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,000 $5,300 - - - $1,000
04 2.4226: Use / purchase optimum sized compressor $150,000 $38,900 - - - $150,000
05 4.812: Apply for investment incentives $7,352 $5,000 - - $7,352 -
TOTAL RECOMMENDED $161,502 $54,809 $1,729
21,693
kWh
$1,422
-
kW-mo/yr
$7,352 $151,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs