ITAC Assessment: WI0111
ITAC logo
ITAC Assessment: WI0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HAND TOOLS
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,616 2,985,053
kWh
Natural Gas $134,835 34,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $4,375 - $4,375
56,272
kWh
- -
02 2.3132: Recharge batteries on during off-peak demand periods $2,019 - $2,019
-
kWh
- -
03 2.7494: Install storm windows and doors $2,291 $8,000 - $2,291
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,002 - $1,402
-
kWh
- $(-400.0)
05 2.1233: Analyze flue gas for proper air/fuel ratio $601 $500 - $601
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $19 $2,074 $155
2,052
kWh
- $(-136.0)
07 2.4133: Use most efficient type of electric motors $91 $233 $91
1,172
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,325 $3,660 $1,325
16,999
kWh
- -
TOTAL RECOMMENDED $11,723 $14,467 $9,367
76,495
kWh
$2,892
-
MMBtu
$(-536.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs