| Assessment Year | 1991 |
|---|---|
| Principal Product | HAND TOOLS |
| NAICS |
n/a
|
| SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $231,616 | 2,985,053 |
kWh
|
$0.078 |
| Natural Gas | $134,835 | 34,895 |
MMBtu
|
$3.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,723 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $4,375 | - |
$4,375
56,272
kWh
|
- | - | |
| 02 | 2.3132: Recharge batteries on during off-peak demand periods | $2,019 | - |
$2,019
-
kWh
|
- | - | |
| 03 | 2.7494: Install storm windows and doors | $2,291 | $8,000 | - |
$2,291
-
MMBtu
|
- | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,002 | - |
$1,402
-
kWh
|
- | $(-400.0) | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $601 | $500 | - |
$601
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19 | $2,074 |
$155
2,052
kWh
|
- | $(-136.0) | |
| 07 | 2.4133: Use most efficient type of electric motors | $91 | $233 |
$91
1,172
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,325 | $3,660 |
$1,325
16,999
kWh
|
- | - | |
| TOTAL RECOMMENDED | $11,723 | $14,467 |
$9,367
76,495
kWh
|
$2,892
-
MMBtu
|
$(-536.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs