| Assessment Year | 2026 |
|---|---|
| Principal Product | Structural Steel |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $100 M to 500M |
| # of Employees | 100 |
| Plant Area |
100,000
ft2
|
| Annual Production | 21,000,000
lb
|
| Production Hrs. Annual | 6,273
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $68,129 | 1,096,695 |
kWh
|
$0.062 | |
| Electricity Demand | $65,578 | 4,950 |
kW-mo/yr
|
$13.25 | |
| Electricity Fees | $3,609 | - |
|
- | |
| Natural Gas | $1,953 | 83 |
MMBtu
|
$23.58 | |
| LPG | $122,736 | 2,212 |
MMBtu
|
$55.49 | |
| Fuel Oil #2 | $50,118 | 1,337 |
MMBtu
|
$37.49 | |
| Waste Disposal Costs | |||||
| Water Usage | $4,333 | 246 |
Tgal
|
$17.61 | |
| TOTAL YEARLY COSTS | $316,457 | ||||
| RECOMMENDED SAVINGS* | $417,477 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Fuel Oil #2 Savings | Primary Raw Material Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $170,396 | $896,000 | - | - | - |
$122,736
-
MMBtu
|
$50,118
-
MMBtu
|
- | $(-2,457.9) | |
| 02 | 2.4323: Use optimum size and capacity equipment | $140,056 | $1,200 | - | - | - | - | - | - | $140,056 | |
| 03 | 4.652: Replace existing equipment with more suitable substitutes | $42,469 | $115,600 |
$977
15,729
kWh
|
$399
-
kW-mo/yr
|
- | - | - | - | $41,094 | |
| 04 | 4.445: Install equipment to move product | $42,394 | $35,000 | - | - | - | - | - | $3,188 | $39,206 | |
| 05 | 2.8121: Apply for tax-free status for energy purchases | $11,337 | $5,000 | - | - | $11,337 | - | - | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,825 | $5,753 |
$7,687
123,789
kWh
|
$3,138
-
kW-mo/yr
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $417,477 | $1,058,553 |
$8,664
139,518
kWh
|
$3,536
-
kW-mo/yr
|
$11,337 |
$122,736
-
MMBtu
|
$50,118
-
MMBtu
|
$3,188 | $217,899 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Fuel Oil #2 Savings | Primary Raw Material Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs