ITAC Assessment: NT0063
ITAC logo
ITAC Assessment: NT0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Structural Steel
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 6,273
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,129 1,096,695
kWh
Electricity Demand $65,578 4,950
kW-mo/yr
Electricity Fees $3,609 -
Natural Gas $1,953 83
MMBtu
LPG $122,736 2,212
MMBtu
Fuel Oil #2 $50,118 1,337
MMBtu
Waste Disposal Costs
Water Usage $4,333 246
Tgal
TOTAL YEARLY COSTS $316,457
RECOMMENDED SAVINGS* $417,477 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $170,396 $896,000 - - - $122,736
-
MMBtu
$50,118
-
MMBtu
- $(-2,457.9)
02 2.4323: Use optimum size and capacity equipment $140,056 $1,200 - - - - - - $140,056
03 4.652: Replace existing equipment with more suitable substitutes $42,469 $115,600 $977
15,729
kWh
$399
-
kW-mo/yr
- - - - $41,094
04 4.445: Install equipment to move product $42,394 $35,000 - - - - - $3,188 $39,206
05 2.8121: Apply for tax-free status for energy purchases $11,337 $5,000 - - $11,337 - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,825 $5,753 $7,687
123,789
kWh
$3,138
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $417,477 $1,058,553 $8,664
139,518
kWh
$3,536
-
kW-mo/yr
$11,337 $122,736
-
MMBtu
$50,118
-
MMBtu
$3,188 $217,899
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs