| Assessment Year | 2004 |
|---|---|
| Principal Product | PLASTIC CRATES |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
90,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $672,907 | 25,108,808 |
kWh
|
$0.027 |
| Electricity Demand | $421,448 | 34,944 |
kW-mo/yr
|
$12.06 |
| Electricity Fees | $65,829 | - |
|
- |
| Natural Gas | $9,007 | 666 |
MMBtu
|
$13.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $266,660 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $149,190 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.7311: Maintain machines to reduce leaks | $121,900 | $45,000 | - | - |
$121,900
-
gal
|
- | |
| 02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $33,950 | $38,000 |
$33,950
918,750
kWh
|
- | - | - | |
| 03 | 2.2625: Chill water to the highest temperature possible | $33,280 | $25,000 |
$21,850
591,360
kWh
|
$11,430
-
kW-mo/yr
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,700 | $22,500 |
$27,700
750,000
kWh
|
- | - | - | |
| 05 | 2.2615: Clean condenser tubes | $22,690 | $3,000 |
$14,900
403,200
kWh
|
$7,790
-
kW-mo/yr
|
- | - | |
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $19,500 | - | - |
$19,500
-
kW-mo/yr
|
- | - | |
| 07 | 2.8114: Change rate schedules or other changes in utility service | $4,600 | $35 | - | - | - | $4,600 | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,040 | $3,737 |
$2,000
54,096
kWh
|
$1,040
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $266,660 | $137,272 |
$100,400
2,717,406
kWh
|
$39,760
-
kW-mo/yr
|
$121,900
-
gal
|
$4,600 | ||
| TOTAL IMPLEMENTED | $149,190 | $48,035 |
$14,900
403,200
kWh
|
$7,790
-
kW-mo/yr
|
$121,900
-
gal
|
$4,600 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs