ITAC Assessment: GT0786
ITAC logo
ITAC Assessment: GT0786
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product PLASTIC CRATES
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 90,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $672,907 25,108,808
kWh
Electricity Demand $421,448 34,944
kW-mo/yr
Electricity Fees $65,829 -
Natural Gas $9,007 666
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $266,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $149,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 3.7311: Maintain machines to reduce leaks $121,900 $45,000 - - $121,900
-
gal
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $33,950 $38,000 $33,950
918,750
kWh
- - -
03 2.2625: Chill water to the highest temperature possible $33,280 $25,000 $21,850
591,360
kWh
$11,430
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,700 $22,500 $27,700
750,000
kWh
- - -
05 2.2615: Clean condenser tubes $22,690 $3,000 $14,900
403,200
kWh
$7,790
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $19,500 - - $19,500
-
kW-mo/yr
- -
07 2.8114: Change rate schedules or other changes in utility service $4,600 $35 - - - $4,600
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,040 $3,737 $2,000
54,096
kWh
$1,040
-
kW-mo/yr
- -
TOTAL RECOMMENDED $266,660 $137,272 $100,400
2,717,406
kWh
$39,760
-
kW-mo/yr
$121,900
-
gal
$4,600
TOTAL IMPLEMENTED $149,190 $48,035 $14,900
403,200
kWh
$7,790
-
kW-mo/yr
$121,900
-
gal
$4,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs