Assessment Year | 2000 |
---|---|
Principal Product | Linen and Garments |
NAICS |
n/a
|
SIC | 2389: Apparel and Accessories, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
22,000
ft2
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,806 | 716,295 |
kWh
|
$0.092 |
Electricity Demand | $4,126 | 352 |
kW-mo/yr
|
$11.72 |
Electricity Fees | $4,841 | - |
|
- |
Natural Gas | $57,782 | 23,318 |
MMBtu
|
$2.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,427 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,427 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,161 | $150 |
$758
12,896
kWh
|
$403
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $746 | $500 |
$746
7,034
kWh
|
- | - | - | - | |
03 | 2.1241: Reduce excessive boiler blowdown | $1,224 | $4,430 | - | - |
$1,224
-
MMBtu
|
- | - | |
04 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $8,000 | $400 | - | - | - |
$8,000
-
lb
|
- | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,296 | $738 | - | - | - | - | $1,296 | |
TOTAL RECOMMENDED | $12,427 | $6,218 |
$1,504
19,930
kWh
|
$403
-
kW-mo/yr
|
$1,224
-
MMBtu
|
$8,000
-
lb
|
$1,296 | ||
TOTAL IMPLEMENTED | $4,427 | $5,818 |
$1,504
19,930
kWh
|
$403
-
kW-mo/yr
|
$1,224
-
MMBtu
|
- | $1,296 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs