ITAC Assessment: UM0157
ITAC logo
ITAC Assessment: UM0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Linen and Garments
NAICS
n/a
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 22,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,806 716,295
kWh
Electricity Demand $4,126 352
kW-mo/yr
Electricity Fees $4,841 -
Natural Gas $57,782 23,318
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,427

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,161 $150 $758
12,896
kWh
$403
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $746 $500 $746
7,034
kWh
- - - -
03 2.1241: Reduce excessive boiler blowdown $1,224 $4,430 - - $1,224
-
MMBtu
- -
04 3.5212: Regrind, reuse, or sell scrap plastic parts $8,000 $400 - - - $8,000
-
lb
-
05 4.111: Add equipment/ operators to reduce production bottleneck $1,296 $738 - - - - $1,296
TOTAL RECOMMENDED $12,427 $6,218 $1,504
19,930
kWh
$403
-
kW-mo/yr
$1,224
-
MMBtu
$8,000
-
lb
$1,296
TOTAL IMPLEMENTED $4,427 $5,818 $1,504
19,930
kWh
$403
-
kW-mo/yr
$1,224
-
MMBtu
- $1,296
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs