ITAC Assessment: MU0073
ITAC logo
ITAC Assessment: MU0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel Products
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 22,150
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 2,730
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,807 85,600
kWh
Electricity Fees $586 -
LPG $17,417 1,099
MMBtu
Other Energy $1,045 1
MMBtu
TOTAL YEARLY COSTS $32,855
RECOMMENDED SAVINGS* $14,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $9,175 $8,435 $(-71.0)
(-441)
kWh
$9,246
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,226 - $2,226
13,802
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $39 $120 $39
242
kWh
-
04 2.4322: Use or replace with energy efficient substitutes $1,348 $296 - $1,348
-
MMBtu
05 2.7134: Use photocell controls $50 $107 $50
313
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $22 $118 $22
136
kWh
-
07 2.7491: Insulate glazing, walls, ceilings, and roofs $1,669 $2,444 - $1,669
-
MMBtu
TOTAL RECOMMENDED $14,529 $11,520 $2,266
14,051
kWh
$12,263
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs