ITAC Assessment: AM0956
ITAC logo
ITAC Assessment: AM0956
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel manufacturing and fabrication
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 186
Plant Area 150,208
ft2
Annual Production 31,000,000
pieces
Production Hrs. Annual 6,206
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,000 3,420,000
kWh
Electricity Demand $102,000 8,330
kW-mo/yr
Electricity Fees $8,430 -
Natural Gas $28,500 3,180
MMBtu
Waste Disposal Costs
Water Usage $4,674 550
Tgal
Water Disposal $5,245 466
Tgal
TOTAL YEARLY COSTS $358,849
RECOMMENDED SAVINGS* $43,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $6,580 $32 $6,580
108,000
kWh
- - - -
02 2.3212: Optimize plant power factor $4,380 $5,640 - $4,380
-
kW-mo/yr
- - -
03 2.8121: Apply for tax-free status for energy purchases $21,750 $15,000 - - $4,350 - $17,400
04 2.6218: Turn off equipment when not in use $3,480 $329 $3,480
81,400
kWh
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,030 $48 $1,020
16,700
kWh
$2,010
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,700 $2,900 $1,900
31,300
kWh
$710
-
kW-mo/yr
- $90 -
07 2.4322: Use or replace with energy efficient substitutes $1,610 $990 $1,610
26,400
kWh
- - - -
TOTAL RECOMMENDED $43,530 $24,939 $14,590
263,800
kWh
$7,100
-
kW-mo/yr
$4,350 $90 $17,400
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs