| Assessment Year | 1987 |
|---|---|
| Principal Product | CONCRETE AND ASPHALT |
| NAICS |
n/a
|
| SIC | 3273: Ready-Mixed Concrete |
| Sales Range | $10 M to 50M |
| # of Employees | 275 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $33,076 | 489,742 |
kWh
|
$0.068 |
| Natural Gas | $11,332 | 2,510 |
MMBtu
|
$4.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $3,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,911 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $559 | $700 | - |
$559
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $79 | $128 |
$59
1,465
kWh
|
- | $20 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $98 | $62 |
$109
1,758
kWh
|
$(-11.0)
-
MMBtu
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $270 | $10 |
$270
6,448
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $165 | $288 |
$165
3,517
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,166 | - |
$1,236
29,308
kWh
|
- | $(-70.0) | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $162 | $100 |
$162
3,517
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $412 | $344 |
$412
6,448
kWh
|
- | - | |
| 09 | 2.4131: Size electric motors for peak operating efficiency | $267 | $100 |
$267
2,052
kWh
|
- | - | |
| TOTAL RECOMMENDED | $3,178 | $1,732 |
$2,680
54,513
kWh
|
$548
-
MMBtu
|
$(-50.0) | ||
| TOTAL IMPLEMENTED | $2,911 | $1,632 |
$2,413
52,461
kWh
|
$548
-
MMBtu
|
$(-50.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs