Assessment Year | 1987 |
---|---|
Principal Product | CONCRETE AND ASPHALT |
NAICS |
n/a
|
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $10 M to 50M |
# of Employees | 275 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $33,076 | 489,742 |
kWh
|
$0.068 |
Natural Gas | $11,332 | 2,510 |
MMBtu
|
$4.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,178 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,911 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $559 | $700 | - |
$559
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $79 | $128 |
$59
1,465
kWh
|
- | $20 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $98 | $62 |
$109
1,758
kWh
|
$(-11.0)
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $270 | $10 |
$270
6,448
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $165 | $288 |
$165
3,517
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,166 | - |
$1,236
29,308
kWh
|
- | $(-70.0) | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $162 | $100 |
$162
3,517
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $412 | $344 |
$412
6,448
kWh
|
- | - | |
09 | 2.4131: Size electric motors for peak operating efficiency | $267 | $100 |
$267
2,052
kWh
|
- | - | |
TOTAL RECOMMENDED | $3,178 | $1,732 |
$2,680
54,513
kWh
|
$548
-
MMBtu
|
$(-50.0) | ||
TOTAL IMPLEMENTED | $2,911 | $1,632 |
$2,413
52,461
kWh
|
$548
-
MMBtu
|
$(-50.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs