Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26 matching assessments
ARC 2+ Digits Required
NAICS Copper rolling, drawing, extruding, and alloying
SIC 2+ Digits Required
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
IP0188 2024 Magnet wire 9 $2,025k $280k
IP0184 2023 Magnet wire 5 $3,760k $142k
SD0643 2023 Insulated copper and specialty wire 8 $185k $85k
UC2308 2023 Metal wires 12 $723k $627k
LE0494 2019 Rods and wires 8 $1,222k $81k
AM0770 2018 Electrical copper wire and cable 11 $418k $79k
IP0074 2016 Magnet wire 10 $2,787k $239k
MI0293 2015 Wires 16 $117k $42k
LE0400 2015 Metal powders 16 $1,476k $238k
TT0159 2015 Bimetallic wire 9 $2,189k $93k
SU0380 2014 Copper wire 9 $1,350k $79k
MZ0121 2013 Insulated copper wire 13 $550k $70k
LE0349 2012 Rolled copper strip 8 $614k $118k
OK0834 2012 Tubings 9 $152k $26k
SU0315 2011 Bare and tinned un-insulated copper wire 8 $1,087k $86k
MS0375 2011 Wire and cable 6 $1,579k $140k
MA0630 2007 Insulated copper wire and cable 6 $195k $55k
MA0620 2007 Copper wire 10 $2,300k $190k
NC0358 2006 Copper tubing 8 $3,174k $823k
MS0294 2006 Copper tubing 7 $8,130k $157k