Assessment Year | 2012 |
---|---|
Principal Product | Bare and tinned un-insulated copper wire |
NAICS | 331420: Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
Sales Range | $10 M to 50M |
# of Employees | 79 |
Plant Area |
150,000
ft2
|
Annual Production | 37,745,500
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $538,013 | 13,333,019 |
kWh
|
$0.040 |
Electricity Demand | $187,740 | 18,000 |
kW-mo/yr
|
$10.43 |
Electricity Fees | $322,182 | - |
|
- |
Natural Gas | $38,771 | 6,092 |
MMBtu
|
$6.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $85,859 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,327 | - |
$6,327
156,624
kWh
|
- | - | - | |
02 | 3.5145: Recover and reuse spent acid baths | $28,847 | $792 | - | - | - | $28,847 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $8,269 | $1,357 |
$8,269
204,672
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $317 | $140 |
$88
2,190
kWh
|
$31
-
kW-mo/yr
|
$119 | $79 | |
05 | 2.6211: Conserve energy by efficient use of vending machines | $149 | $652 |
$149
3,688
kWh
|
- | - | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $33,502 | $167,290 |
$(-14,874.0)
(-368,160)
kWh
|
$(-7,384.0)
-
kW-mo/yr
|
- | $55,760 | |
07 | 2.3212: Optimize plant power factor | $8,366 | $42,403 | - | - | - | $8,366 | |
08 | 2.4321: Upgrade obsolete equipment | $82 | $436 |
$55
1,373
kWh
|
$27
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $85,859 | $213,070 |
$14
387
kWh
|
$(-7,326.0)
-
kW-mo/yr
|
$119 | $93,052 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs