Assessment Year | 1998 |
---|---|
Principal Product | Machined Parts |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
36,000
ft2
|
Annual Production | 2,000
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $37,771 | 605,217 |
kWh
|
$0.062 |
Electricity Demand | $5,890 | 2,501 |
kW-mo/yr
|
$2.36 |
Electricity Fees | $305 | - |
|
- |
Natural Gas | $9,890 | 2,114 |
MMBtu
|
$4.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,166 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,605 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,996 | $900 |
$3,633
57,737
kWh
|
$1,363
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,869 | $4,085 |
$1,851
31,946
kWh
|
$708
-
kW-mo/yr
|
- | - | $310 | |
03 | 2.4224: Upgrade controls on compressors | $2,025 | - |
$1,503
21,981
kWh
|
$522
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $647 | $250 |
$481
7,034
kWh
|
$166
-
kW-mo/yr
|
- | - | - | |
05 | 2.4314: Use synthetic lubricant | $641 | $300 |
$476
7,034
kWh
|
$165
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $459 | $225 |
$306
5,569
kWh
|
$153
-
kW-mo/yr
|
- | - | - | |
07 | 3.4151: Minimize water usage | $319 | $625 | - | - |
$319
-
Tgal
|
- | - | |
08 | 4.423: Move product using mechanical means | $11,232 | $6,000 | - | - | - | $11,232 | - | |
09 | 3.5311: Recover and reuse waste material | $5,715 | $2,500 | - | - | - | $5,715 | - | |
10 | 4.821: Pay bills on time to avoid late fees | $263 | - | - | - | - | $263 | - | |
TOTAL RECOMMENDED | $29,166 | $14,885 |
$8,250
131,301
kWh
|
$3,077
-
kW-mo/yr
|
$319
-
Tgal
|
$17,210 | $310 | ||
TOTAL IMPLEMENTED | $15,605 | $7,485 |
$6,987
111,664
kWh
|
$2,593
-
kW-mo/yr
|
- | $5,715 | $310 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs