ITAC Assessment: MZ0333
ITAC logo
ITAC Assessment: MZ0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Beef, Pork, Grind, and Chicken
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 150,000
ft2
Annual Production 105,000,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $661,232 11,281,200
kWh
Electricity Demand $385,224 25,116
kW-mo/yr
Electricity Fees $9,602 -
Natural Gas $76,347 10,145
MMBtu
TOTAL YEARLY COSTS $1,132,405
RECOMMENDED SAVINGS* $27,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,542 $3,330 - $14,542
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,379 $21,815 $5,229
89,235
kWh
$3,150
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $2,733 $1,330 - - $2,733
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,752 $66 $998
17,031
kWh
$754
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,406 $26,541 $6,227
106,266
kWh
$18,446
-
kW-mo/yr
$2,733
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs