ITAC Assessment: AS0199
ITAC logo
ITAC Assessment: AS0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Golf Accessories
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 283
Plant Area 80,000
ft2
Annual Production 515,000
pieces
Production Hrs. Annual 3,332
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,892 2,281,653
kWh
Electricity Demand $12,803 7,558
kW-mo/yr
Electricity Fees $14,428 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $241,062 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,454

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $410 - $373
7,620
kWh
$37
-
kW-mo/yr
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,976 $140 $2,609
53,048
kWh
$367
-
kW-mo/yr
- - - - -
03 2.4314: Use synthetic lubricant $570 $300 $471
9,672
kWh
$40
-
kW-mo/yr
$7
-
gal
- - - $52
04 2.7232: Replace existing hvac unit with high efficiency model $8,593 $12,000 $7,855
159,437
kWh
$738
-
kW-mo/yr
- - - - -
05 2.2622: Replace existing chiller with high efficiency model $10,117 $7,000 $9,146
185,522
kWh
$971
-
kW-mo/yr
- - - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,411 $3,015 $1,339
27,257
kWh
$72
-
kW-mo/yr
- - - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,995 $13,000 $4,379
88,804
kWh
$616
-
kW-mo/yr
- - - - -
08 2.4133: Use most efficient type of electric motors $1,635 $3,183 $1,400
28,429
kWh
$235
-
kW-mo/yr
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $396 $570 $376
7,620
kWh
$20
-
kW-mo/yr
- - - - -
10 2.7145: Install skylights $1,207 $1,200 $1,023
20,809
kWh
$184
-
kW-mo/yr
- - - - -
11 2.7111: Reduce illumination to minimum necessary levels $2,037 - $1,835
37,222
kWh
$202
-
kW-mo/yr
- - - - -
12 2.7135: Install occupancy sensors $1,492 $2,250 $1,384
28,136
kWh
$108
-
kW-mo/yr
- - - - -
13 3.5216: Recycle nonferrous dust $176 - - - - $176
-
lb
- - -
14 4.512: Condense operation into one building $205,047 $15,000 $60,100
1,219,226
kWh
$8,489
-
kW-mo/yr
- - $6,494 $129,964 -
TOTAL RECOMMENDED $241,062 $57,658 $92,290
1,872,802
kWh
$12,079
-
kW-mo/yr
$7
-
gal
$176
-
lb
$6,494 $129,964 $52
TOTAL IMPLEMENTED $7,454 $3,893 $6,593
133,939
kWh
$861
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs