ITAC Assessment: LE0400
ITAC logo
ITAC Assessment: LE0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Metal Powders
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $50
M
to 100
M
# of Employees 24
Plant Area 87,786
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $934,999 11,277,448
kWh
Electricity Demand $109,079 25,381
kW-mo/yr
Electricity Fees $309,726 -
Natural Gas $122,366 15,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $237,877 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $16,723 $28 $15,614
188,120
kWh
$1,109
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,648 $512 $7,215
86,933
kWh
$433
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,673 $1,000 $5,183
62,443
kWh
$490
-
kW-mo/yr
- -
04 2.2443: Re-use or recycle hot or cold process exhaust air $8,953 $1,920 - - $8,953
-
MMBtu
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $30,027 $5,000 $(-6,978.2)
(-84,075)
kWh
$(-494.5)
-
kW-mo/yr
- $37,500
06 2.2622: Replace existing chiller with high efficiency model $27,922 $10,500 $26,103
314,496
kWh
$1,819
-
kW-mo/yr
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,457 $3,025 - $5,457
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,074 $35,000 $24,341
293,268
kWh
$1,733
-
kW-mo/yr
- -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,334 $16,500 $13,706
165,132
kWh
$1,281
-
kW-mo/yr
$(-5,653.1)
-
MMBtu
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,729 $48,067 $20,284
244,390
kWh
$1,445
-
kW-mo/yr
- -
11 2.4226: Use / purchase optimum sized compressor $42,371 $95,000 $39,554
476,559
kWh
$2,817
-
kW-mo/yr
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $2,188 $5,469 $1,871
22,543
kWh
$26
-
kW-mo/yr
- $291
13 2.7142: Utilize higher efficiency lamps and/or ballasts $17,886 $69,160 $16,699
201,190
kWh
$1,187
-
kW-mo/yr
- -
14 2.7231: Use radiant heater for spot heating $5,902 $24,000 - - $5,902
-
MMBtu
-
15 2.7232: Replace existing hvac unit with high efficiency model $1,678 $6,940 $1,650
19,877
kWh
$28
-
kW-mo/yr
- -
16 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,312 $35,000 $7,589
91,436
kWh
$722
-
kW-mo/yr
- -
TOTAL RECOMMENDED $237,877 $357,121 $172,832
2,082,312
kWh
$18,052
-
kW-mo/yr
$9,202
-
MMBtu
$37,791
TOTAL IMPLEMENTED $102,530 $209,701 $89,811
1,082,064
kWh
$12,178
-
kW-mo/yr
$249
-
MMBtu
$291
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs