ITAC Assessment: LE0494
ITAC logo
ITAC Assessment: LE0494
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Rods and wires
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $100
M
to 500
M
# of Employees 33
Plant Area 120,000
ft2
Annual Production 5,500,000
units
Production Hrs. Annual 6,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $793,798 17,179,211
kWh
Electricity Demand $99,817 33,492
kW-mo/yr
Electricity Fees $30,314 -
Natural Gas $297,739 45,135
MMBtu
TOTAL YEARLY COSTS $1,221,668
RECOMMENDED SAVINGS* $80,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,038

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $3,038 $1,620 $741
16,103
kWh
- $2,297
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,651 $13,000 $19,277
419,065
kWh
$1,374
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,586 $11,000 $9,883
214,848
kWh
$703
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,225 $8,000 $6,745
146,633
kWh
$480
-
kW-mo/yr
-
05 2.2442: Preheat combustion air with waste heat $22,684 $35,000 - - $22,684
-
MMBtu
06 2.4226: Use / purchase optimum sized compressor $3,199 $10,000 $2,838
61,690
kWh
$361
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $8,702 $43,257 $7,528
163,655
kWh
$1,174
-
kW-mo/yr
-
08 2.7232: Replace existing hvac unit with high efficiency model $4,873 $27,900 $4,137
89,940
kWh
$736
-
kW-mo/yr
-
TOTAL RECOMMENDED $80,958 $149,777 $51,149
1,111,934
kWh
$4,828
-
kW-mo/yr
$24,981
-
MMBtu
TOTAL IMPLEMENTED $3,038 $1,620 $741
16,103
kWh
- $2,297
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs