ITAC Assessment: AS0278
ITAC logo
ITAC Assessment: AS0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Coils
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 24,000
ft2
Annual Production 35,000
pieces
Production Hrs. Annual 5,225
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,093 544,842
kWh
Electricity Demand $2,853 1,753
kW-mo/yr
Electricity Fees $3,246 -
Natural Gas $27,167 4,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,451 $5,643 $2,894
38,394
kWh
$557
-
kW-mo/yr
- -
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $260 $120 $260
3,517
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,407 $120 $2,071
27,550
kWh
$336
-
kW-mo/yr
- -
04 3.6192: Use a less expensive method of waste removal $666 $60 - - - $666
-
lb
05 3.4156: Use flow control valves on equipment to optimize water use $970 $60 - - $970
-
Tgal
-
TOTAL RECOMMENDED $7,754 $6,003 $5,225
69,461
kWh
$893
-
kW-mo/yr
$970
-
Tgal
$666
-
lb
TOTAL IMPLEMENTED $4,043 $240 $2,071
27,550
kWh
$336
-
kW-mo/yr
$970
-
Tgal
$666
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs