ITAC Assessment: UD0701
ITAC logo
ITAC Assessment: UD0701
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Gelatin Based Desserts and Dairy Dips
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 168
Plant Area 60,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,351 4,093,954
kWh
Electricity Demand $110,276 9,132
kW-mo/yr
Natural Gas $160,825 21,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $301,364 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 3.7214: Reduce or eliminate waste $85,956 $19,600 - - - - $34,476
-
lb
$51,480 - -
02 2.1241: Reduce excessive boiler blowdown $55,242 $1,619 - - - $42,529
-
Tgal
- - $12,713
-
Tgal
-
03 3.4155: Meter waste water $51,851 $15,700 - - - $51,851
-
Tgal
- - - -
04 3.7214: Reduce or eliminate waste $38,220 $620 - - - - $37,440
-
lb
$780 - -
05 2.7314: Reduce ventilation air $22,847 $31,250 $(-1,030.0)
(-46,800)
kWh
$(-1,123.0)
-
kW-mo/yr
- - - - - $25,000
06 2.4226: Use / purchase optimum sized compressor $8,494 $1,500 $3,552
154,440
kWh
$4,942
-
kW-mo/yr
- - - - - -
07 2.2414: Use waste heat from hot flue gases to preheat $7,577 $16,000 - - $7,577
-
MMBtu
- - - - -
08 2.1241: Reduce excessive boiler blowdown $6,179 $4,000 - - $5,422
-
MMBtu
$584
-
Tgal
- - $173
-
Tgal
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $5,926 - - - $5,926
-
MMBtu
- - - - -
10 2.2136: Install / repair insulation on steam lines $5,896 $4,800 - - $5,896
-
MMBtu
- - - - -
11 2.2135: Repair and eliminate steam leaks $5,373 $146 - - $2,843
-
MMBtu
$2,530
-
Tgal
- - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $5,315 $16,140 $3,090
134,352
kWh
$2,225
-
kW-mo/yr
- - - - - -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $1,444 $3,294 $722
31,400
kWh
$722
-
kW-mo/yr
- - - - - -
14 2.7122: Disconnect ballasts $397 $30 $198
8,611
kWh
$199
-
kW-mo/yr
- - - - - -
15 2.4239: Eliminate or reduce compressed air usage $386 $174 $161
7,020
kWh
$225
-
kW-mo/yr
- - - - - -
16 2.4111: Utilize energy-efficient belts and other improved mechanisms $261 $125 $108
4,680
kWh
$144
-
kW-mo/yr
- - - - - $9
TOTAL RECOMMENDED $301,364 $114,998 $6,801
293,703
kWh
$7,334
-
kW-mo/yr
$27,664
-
MMBtu
$97,494
-
Tgal
$71,916
-
lb
$52,260 $12,886
-
Tgal
$25,009
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs