Assessment Year | 2005 |
---|---|
Principal Product | Powdered Metal Parts |
NAICS | 332111: Iron and Steel Forging |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
110,000
ft2
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 6,874
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,500,000 | - |
|
- |
Electricity Demand | $60,348 | - |
|
- |
Natural Gas | $98,353 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,555 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $85,726 | $22,992 | - |
$85,726
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $500 | $300 |
$500
5,000
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $425 | - |
$425
1,788
kWh
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $9,400 | - |
$9,400
677
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $77 | - |
$77
141
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,427 | - |
$30,427
1,736
kWh
|
- | |
TOTAL RECOMMENDED | $126,555 | $23,292 |
$40,829
9,342
kWh
|
$85,726
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs