IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Wire and Cable
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $100
M
to 500
M
# of Employees 230
Plant Area 500,000
ft2
Annual Production 84,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $948,116 20,023,259
kWh
Electricity Demand $362,733 37,865
kW-mo/yr
Electricity Fees $6,863 -
Natural Gas $260,907 49,971
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $139,625 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $86,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,069 $317 $3,022
64,625
kWh
- $47 -
02 2.2136: Install / repair insulation on steam lines $43,721 $10,838 - - - $43,721
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $9,190 $5,056 - - - $9,190
-
MMBtu
04 2.7135: Install occupancy sensors $3,053 $3,424 $3,007
63,515
kWh
- $46 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $76,407 $144,900 $58,657
1,238,804
kWh
$16,620
-
kW-mo/yr
$1,130 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,185 $26,542 $3,213
67,849
kWh
$910
-
kW-mo/yr
$62 -
TOTAL RECOMMENDED $139,625 $191,077 $67,899
1,434,793
kWh
$17,530
-
kW-mo/yr
$1,285 $52,911
-
MMBtu
TOTAL IMPLEMENTED $86,714 $175,183 $67,899
1,434,793
kWh
$17,530
-
kW-mo/yr
$1,285 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings