ITAC Assessment: IP0184
ITAC logo
ITAC Assessment: IP0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Magnet Wire
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 329,613
ft2
Annual Production 138,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,012,451 31,897,952
kWh
Electricity Demand $837,931 51,660
kW-mo/yr
Electricity Fees $7,896 -
Natural Gas $901,965 180,347
MMBtu
Waste Disposal Costs
Water Usage $19,296 9,230
Tgal
TOTAL YEARLY COSTS $3,779,539
RECOMMENDED SAVINGS* $141,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $141,947

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $14,493 - - $14,493
-
kW-mo/yr
-
02 2.2163: Use minimum steam operating pressure $83,429 $20,365 - - $83,429
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $8,667 $2,615 $7,093
112,584
kWh
$1,574
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,216 $17,960 $31,216
496,214
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,142 $12,019 $3,062
48,604
kWh
$1,080
-
kW-mo/yr
-
TOTAL RECOMMENDED $141,947 $52,959 $41,371
657,402
kWh
$17,147
-
kW-mo/yr
$83,429
-
MMBtu
TOTAL IMPLEMENTED $141,947 $52,959 $41,371
657,402
kWh
$17,147
-
kW-mo/yr
$83,429
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs