ITAC Assessment: MA0283
ITAC logo
ITAC Assessment: MA0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Hand tools,containers an
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 33
Plant Area 50,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,496
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,202 237,691
kWh
Fuel Oil #2 $11,419 2,274
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,396

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,690 $435 $3,690
29,015
kWh
- -
02 2.3212: Optimize plant power factor $3,380 $6,000 $3,380
-
kWh
- -
03 3.4115: Recover and reuse cooling water $1,407 $200 $(-75.0)
(-586)
kWh
- $1,482
-
Tgal
04 2.7135: Install occupancy sensors $596 $710 $596
4,689
kWh
- -
05 2.2122: Install / repair insulation on condensate lines $548 $151 $548
9,379
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $371 $400 - $371
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $335 - $335
2,638
kWh
- -
TOTAL RECOMMENDED $10,327 $7,896 $8,474
45,135
kWh
$371
-
MMBtu
$1,482
-
Tgal
TOTAL IMPLEMENTED $9,396 $7,186 $7,543
37,808
kWh
$371
-
MMBtu
$1,482
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs