ITAC Assessment: LS0525
ITAC logo
ITAC Assessment: LS0525
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Elementary School
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 60
Plant Area 61,506
ft2
Annual Production 1
units
Production Hrs. Annual 1,950
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,300 691,319
kWh
TOTAL YEARLY COSTS $86,300
RECOMMENDED SAVINGS* $21,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2625: Chill water to the highest temperature possible $6,053 $250 $6,053
48,427
kWh
02 2.7224: Reduce space conditioning during non-working hours $2,289 $175 $2,289
18,312
kWh
03 2.7423: Reduce heat gain by window tinting $9,960 $1,680 $9,960
79,682
kWh
04 2.7135: Install occupancy sensors $1,273 $480 $1,273
10,184
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,856 $1,224 $1,856
14,852
kWh
TOTAL RECOMMENDED $21,431 $3,809 $21,431
171,457
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs