Assessment Year | 2012 |
---|---|
Principal Product | Tubings |
NAICS | 331420: Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
66,000
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,016 | 1,877,800 |
kWh
|
$0.044 |
Electricity Demand | $34,982 | 4,766 |
kW-mo/yr
|
$7.34 |
Natural Gas | $34,301 | 4,235 |
MMBtu
|
$8.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,887 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,006 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $3,800 | - | - | - | - | $3,800 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,600 | $18,285 |
$1,490
33,700
kWh
|
$1,110
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $1,900 | $900 |
$1,900
42,900
kWh
|
- | - | - | |
04 | 2.1232: Keep boiler tubes clean | $810 | $500 | - | - |
$810
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,755 | $1,500 |
$1,755
39,700
kWh
|
- | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $3,509 | $2,000 |
$3,509
79,400
kWh
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,772 | $13,200 |
$1,772
40,100
kWh
|
- | - | - | |
08 | 2.4224: Upgrade controls on compressors | $4,641 | - |
$4,641
105,000
kWh
|
- | - | - | |
09 | 2.6242: Minimize operation of equipment maintained in standby condition | $5,100 | - |
$1,857
42,000
kWh
|
- |
$3,243
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $25,887 | $36,385 |
$16,924
382,800
kWh
|
$1,110
-
kW-mo/yr
|
$4,053
-
MMBtu
|
$3,800 | ||
TOTAL IMPLEMENTED | $11,006 | $2,000 |
$6,396
144,700
kWh
|
- |
$810
-
MMBtu
|
$3,800 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs