ITAC Assessment: OK0834
ITAC logo
ITAC Assessment: OK0834
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Tubings
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 66,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,016 1,877,800
kWh
Electricity Demand $34,982 4,766
kW-mo/yr
Natural Gas $34,301 4,235
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $3,800 - - - - $3,800
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,600 $18,285 $1,490
33,700
kWh
$1,110
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $1,900 $900 $1,900
42,900
kWh
- - -
04 2.1232: Keep boiler tubes clean $810 $500 - - $810
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,755 $1,500 $1,755
39,700
kWh
- - -
06 2.4239: Eliminate or reduce compressed air usage $3,509 $2,000 $3,509
79,400
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,772 $13,200 $1,772
40,100
kWh
- - -
08 2.4224: Upgrade controls on compressors $4,641 - $4,641
105,000
kWh
- - -
09 2.6242: Minimize operation of equipment maintained in standby condition $5,100 - $1,857
42,000
kWh
- $3,243
-
MMBtu
-
TOTAL RECOMMENDED $25,887 $36,385 $16,924
382,800
kWh
$1,110
-
kW-mo/yr
$4,053
-
MMBtu
$3,800
TOTAL IMPLEMENTED $11,006 $2,000 $6,396
144,700
kWh
- $810
-
MMBtu
$3,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs