ITAC Assessment: DL0175
ITAC logo
ITAC Assessment: DL0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Health Services
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area 776,000
ft2
Annual Production 7,300
units
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,235,432 16,304,335
kWh
Electricity Demand $125,408 33,576
kW-mo/yr
Electricity Fees $206,539 -
Natural Gas $498,649 62,048
MMBtu
TOTAL YEARLY COSTS $2,066,028
RECOMMENDED SAVINGS* $237,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $56,617 $180,488 $56,617
682,138
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,500 $144,400 $34,500
415,500
kWh
-
03 2.7225: Close outdoor air dampers during warm-up / cool-down periods $84,055 $4,400 $9,055
109,100
kWh
$75,000
-
MMBtu
04 2.2437: Recover waste heat from equipment $62,553 $233,080 $6,728
81,055
kWh
$55,825
-
MMBtu
TOTAL RECOMMENDED $237,725 $562,368 $106,900
1,287,793
kWh
$130,825
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs