Assessment Year | 2008 |
---|---|
Principal Product | Insulated copper wire and cable |
NAICS | 331420: Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 72 |
Plant Area |
100,000
ft2
|
Annual Production | 100,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,369 | 1,429,800 |
kWh
|
$0.10 |
Electricity Demand | $20,698 | 4,486 |
kW-mo/yr
|
$4.61 |
Other Gas | $28,300 | 1,418 |
MMBtu
|
$19.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,097 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,393 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.2692: Use outside cold water source as a supply of cooling water | $29,594 | $49,500 |
$(-1,902.0)
(-18,600)
kWh
|
$(-166.0)
-
kW-mo/yr
|
$31,662
-
Tgal
|
|
02 | 2.3322: Use existing dam to generate electricity | $22,703 | $72,000 |
$21,381
209,000
kWh
|
$1,322
-
kW-mo/yr
|
- | |
03 | 2.2628: Utilize a less expensive cooling method | $1,565 | $2,000 |
$1,565
15,300
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $639 | $300 |
$639
6,394
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $407 | $1,944 |
$407
4,066
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $189 | $1,300 |
$189
1,886
kWh
|
- | - | |
TOTAL RECOMMENDED | $55,097 | $127,044 |
$22,279
218,046
kWh
|
$1,156
-
kW-mo/yr
|
$31,662
-
Tgal
|
||
TOTAL IMPLEMENTED | $2,393 | $3,600 |
$2,393
23,580
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs