ITAC Assessment: MA0630
ITAC logo
ITAC Assessment: MA0630
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Insulated copper wire and cable
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 100,000
ft2
Annual Production 100,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,369 1,429,800
kWh
Electricity Demand $20,698 4,486
kW-mo/yr
Other Gas $28,300 1,418
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,097 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.2692: Use outside cold water source as a supply of cooling water $29,594 $49,500 $(-1,902.0)
(-18,600)
kWh
$(-166.0)
-
kW-mo/yr
$31,662
-
Tgal
02 2.3322: Use existing dam to generate electricity $22,703 $72,000 $21,381
209,000
kWh
$1,322
-
kW-mo/yr
-
03 2.2628: Utilize a less expensive cooling method $1,565 $2,000 $1,565
15,300
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $639 $300 $639
6,394
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $407 $1,944 $407
4,066
kWh
- -
06 2.7135: Install occupancy sensors $189 $1,300 $189
1,886
kWh
- -
TOTAL RECOMMENDED $55,097 $127,044 $22,279
218,046
kWh
$1,156
-
kW-mo/yr
$31,662
-
Tgal
TOTAL IMPLEMENTED $2,393 $3,600 $2,393
23,580
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs