| Assessment Year | 2008 |
|---|---|
| Principal Product | Rice |
| NAICS | 311119: Other Animal Food Manufacturing |
| SIC | 2044: Rice Milling |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
285,000
ft2
|
| Annual Production | 170,000,000
lb
|
| Production Hrs. Annual | 8,376
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,141,110 | 15,497,257 |
kWh
|
$0.074 |
| Electricity Demand | $161,106 | 32,465 |
kW-mo/yr
|
$4.96 |
| Electricity Fees | $4,077 | - |
|
- |
| Natural Gas | $4,374,215 | 522,816 |
MMBtu
|
$8.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $210,460 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2441: Preheat boiler makeup water with waste process heat | $163,000 | $105,000 | - | - |
$163,000
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,400 | $52,400 |
$26,400
330,000
kWh
|
$4,000
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,990 | - |
$4,360
54,530
kWh
|
$630
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,140 | $570 |
$5,600
70,100
kWh
|
$540
-
kW-mo/yr
|
- | - | |
| 05 | 2.3212: Optimize plant power factor | $4,100 | $15,230 | - |
$4,100
-
kW-mo/yr
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,830 | $605 |
$270
3,430
kWh
|
$30
-
kW-mo/yr
|
- | $1,530 | |
| TOTAL RECOMMENDED | $210,460 | $173,805 |
$36,630
458,060
kWh
|
$9,300
-
kW-mo/yr
|
$163,000
-
MMBtu
|
$1,530 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs