Assessment Year | 2008 |
---|---|
Principal Product | Rice |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2044: Rice Milling |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
285,000
ft2
|
Annual Production | 170,000,000
lb
|
Production Hrs. Annual | 8,376
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,141,110 | 15,497,257 |
kWh
|
$0.074 |
Electricity Demand | $161,106 | 32,465 |
kW-mo/yr
|
$4.96 |
Electricity Fees | $4,077 | - |
|
- |
Natural Gas | $4,374,215 | 522,816 |
MMBtu
|
$8.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $210,460 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $163,000 | $105,000 | - | - |
$163,000
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,400 | $52,400 |
$26,400
330,000
kWh
|
$4,000
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,990 | - |
$4,360
54,530
kWh
|
$630
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,140 | $570 |
$5,600
70,100
kWh
|
$540
-
kW-mo/yr
|
- | - | |
05 | 2.3212: Optimize plant power factor | $4,100 | $15,230 | - |
$4,100
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,830 | $605 |
$270
3,430
kWh
|
$30
-
kW-mo/yr
|
- | $1,530 | |
TOTAL RECOMMENDED | $210,460 | $173,805 |
$36,630
458,060
kWh
|
$9,300
-
kW-mo/yr
|
$163,000
-
MMBtu
|
$1,530 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs