ITAC Assessment: AM0539
ITAC logo
ITAC Assessment: AM0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Rice
NAICS 311119: Other Animal Food Manufacturing
SIC 2044: Rice Milling
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 285,000
ft2
Annual Production 170,000,000
lb
Production Hrs. Annual 8,376
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,141,110 15,497,257
kWh
Electricity Demand $161,106 32,465
kW-mo/yr
Electricity Fees $4,077 -
Natural Gas $4,374,215 522,816
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $210,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2441: Preheat boiler makeup water with waste process heat $163,000 $105,000 - - $163,000
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $30,400 $52,400 $26,400
330,000
kWh
$4,000
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,990 - $4,360
54,530
kWh
$630
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,140 $570 $5,600
70,100
kWh
$540
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $4,100 $15,230 - $4,100
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,830 $605 $270
3,430
kWh
$30
-
kW-mo/yr
- $1,530
TOTAL RECOMMENDED $210,460 $173,805 $36,630
458,060
kWh
$9,300
-
kW-mo/yr
$163,000
-
MMBtu
$1,530
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs