ITAC Assessment: SF0391
ITAC logo
ITAC Assessment: SF0391
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Recycled Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 958,320
ft2
Annual Production 4,927,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $386,991 4,668,198
kWh
Electricity Demand $157,608 13,688
kW-mo/yr
Electricity Fees $8,229 -
Natural Gas $166,222 24,872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $256,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $1,075 - - - $1,075
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,321 $16,124 $22,282
263,696
kWh
$4,039
-
kW-mo/yr
- -
03 2.4322: Use or replace with energy efficient substitutes $14,943 $11,249 $14,943
176,835
kWh
- - -
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $128,228 $381,609 $102,021
1,207,354
kWh
$26,207
-
kW-mo/yr
- -
05 2.4322: Use or replace with energy efficient substitutes $25,418 $81,160 $4,498
53,227
kWh
$5,753
-
kW-mo/yr
- $15,167
06 2.7142: Utilize higher efficiency lamps and/or ballasts $11,635 $40,292 $9,225
109,176
kWh
$2,410
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $4,484 $17,522 $3,608
42,698
kWh
$876
-
kW-mo/yr
- -
08 2.4322: Use or replace with energy efficient substitutes $27,181 $174,884 $23,009
272,290
kWh
$4,172
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,506 $328,173 $15,413
182,403
kWh
$2,093
-
kW-mo/yr
- -
TOTAL RECOMMENDED $256,791 $1,051,013 $194,999
2,307,679
kWh
$45,550
-
kW-mo/yr
$1,075
-
MMBtu
$15,167
TOTAL IMPLEMENTED $31,062 $69,063 $27,776
328,709
kWh
$3,286
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs