ITAC Assessment: MA0389
ITAC logo
ITAC Assessment: MA0389
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Antique Style Furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 85,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,207 339,683
kWh
Electricity Demand $21,692 1,585
kW-mo/yr
Electricity Fees $1,777 -
Natural Gas $12,394 1,285
MMBtu
Fuel Oil #2 $58,707 10,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,993

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Fuel Oil #2 Savings Administrative Changes Savings
01 4.821: Pay bills on time to avoid late fees $2,061 - - - - $2,061
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,610 $2,100 $1,610
18,464
kWh
- - -
03 2.2136: Install / repair insulation on steam lines $592 $860 - - $592
-
MMBtu
-
04 2.7124: Make a practice of turning off lights when not needed $565 - $565
17,878
kWh
- - -
05 2.8118: Check for accuracy of utility / power meters $538 $60 - $538 - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $298 $75 $298
15,240
kWh
- - -
TOTAL RECOMMENDED $5,664 $3,095 $2,473
51,582
kWh
$538 $592
-
MMBtu
$2,061
TOTAL IMPLEMENTED $1,993 $995 $863
33,118
kWh
$538 $592
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs