ITAC Assessment: OK0961
ITAC logo
ITAC Assessment: OK0961
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Steel wires
NAICS 331222: Steel Wire Drawing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $50
M
to 100
M
# of Employees 204
Plant Area 400,000
ft2
Annual Production 21,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,747,680 36,880,800
kWh
Electricity Demand $898,762 80,331
kW-mo/yr
Natural Gas $450,070 139,617
MMBtu
Waste Disposal Costs
Water Usage $629,165 92,389
Tgal
Water Disposal $231,619 69,292
Tgal
TOTAL YEARLY COSTS $3,957,296
RECOMMENDED SAVINGS* $1,770,265 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
01 2.7241: Install outside air damper / economizer on hvac unit $1,024 $5,000 $1,024
21,778
kWh
- - - - -
02 2.7211: Clean and maintain refrigerant condensers and towers $1,730 $400 $898
19,126
kWh
$832
-
kW-mo/yr
- - - -
03 2.6232: Install set-back timers $605 $800 $141
2,998
kWh
- $464
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $80,050 $185,484 $60,365
1,284,356
kWh
$19,685
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,978 $7,268 $944
20,093
kWh
$1,034
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $831 $3,220 $831
17,679
kWh
- - - - -
07 2.4322: Use or replace with energy efficient substitutes $216,378 $7,000 $137,617
2,928,020
kWh
$78,761
-
kW-mo/yr
- - - -
08 2.4322: Use or replace with energy efficient substitutes $12,104 $792 $4,791
101,945
kWh
$7,313
-
kW-mo/yr
- - - -
09 2.2614: Use cooling tower or economizer to replace chiller cooling $50,374 $124,000 $50,374
1,071,798
kWh
- - - - -
10 2.2514: Cover open tanks $27,427 $3,900 - - $27,427
-
MMBtu
- - -
11 2.4131: Size electric motors for peak operating efficiency $44,544 $8,817 $29,524
628,178
kWh
$15,020
-
kW-mo/yr
- - - -
12 3.5132: Reuse rich white water in other applications $523,580 $500,000 - - - $292,146
-
Tgal
$231,434
-
Tgal
-
13 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $311,801 $1,832,665 $457,517
9,734,400
kWh
$209,477
-
kW-mo/yr
$(-198,963.0)
-
MMBtu
- - $(-156,230.0)
14 2.4322: Use or replace with energy efficient substitutes $497,839 $3,000,000 $86,942
1,830,360
kWh
$410,897
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $1,770,265 $5,679,346 $830,968
17,660,731
kWh
$743,019
-
kW-mo/yr
$(-171,072.0)
-
MMBtu
$292,146
-
Tgal
$231,434
-
Tgal
$(-156,230.0)
TOTAL IMPLEMENTED $1,730 $400 $898
19,126
kWh
$832
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs