ITAC Assessment: NC0148
ITAC logo
ITAC Assessment: NC0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Rockwool insulation
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 50,000
ft2
Annual Production 112,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $383,777 13,047,773
kWh
Electricity Demand $206,237 24,715
kW-mo/yr
Electricity Fees $36,277 -
Coal $1,090,566 369,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.2437: Recover waste heat from equipment $2,914 $10,000 $1,885
65,064
kWh
$1,029
-
kW-mo/yr
- - -
02 2.5123: Reduce fluid flow rates $304 $550 $218
7,620
kWh
$86
-
kW-mo/yr
- - -
03 4.111: Add equipment/ operators to reduce production bottleneck $7,677 $10,000 - - $1,344 - $6,333
04 4.445: Install equipment to move product $63,429 $80,000 $(-1,270.0)
(-43,669)
kWh
$(-501.0)
-
kW-mo/yr
$67,200 $(-2,000.0) -
TOTAL RECOMMENDED $74,324 $100,550 $833
29,015
kWh
$614
-
kW-mo/yr
$68,544 $(-2,000.0) $6,333
TOTAL IMPLEMENTED $71,410 $90,550 $(-1,052.0)
(-36,049)
kWh
$(-415.0)
-
kW-mo/yr
$68,544 $(-2,000.0) $6,333
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs