ITAC Assessment: AS0065
ITAC logo
ITAC Assessment: AS0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HIGH DENSITY ELECTRONIC CIRCUITS
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area
n/a
Annual Production 66,000
pieces
Production Hrs. Annual 6,320
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,642 2,762,016
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,052 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7226: Use computer programs to optimize hvac performance $15,953 $17,550 $15,953
235,932
kWh
- -
02 2.7234: Use heat pump for space conditioning $25,121 $152,160 $25,121
371,630
kWh
- -
03 2.7221: Lower temperature during the winter season and vice-versa $4,000 - $4,000
59,203
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,555 $14,446 $2,795
41,325
kWh
- $(-240.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $598 $1,215 $598
8,792
kWh
- -
06 2.2511: Insulate bare equipment $128 $80 - $128
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,790 $1,000 $3,790
55,979
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $364 $100 $364
5,275
kWh
- -
09 2.4133: Use most efficient type of electric motors $543 $2,649 $543
7,913
kWh
- -
TOTAL RECOMMENDED $53,052 $189,200 $53,164
786,049
kWh
$128
-
MMBtu
$(-240.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs