ITAC Assessment: SD0095
ITAC logo
ITAC Assessment: SD0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Gyroscope
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 214
Plant Area 25,000
ft2
Annual Production 1,100
pieces
Production Hrs. Annual 4,330
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,166 932,298
kWh
Natural Gas $11,232 1,553
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,578 $3,900 $1,578
15,826
kWh
-
02 2.4323: Use optimum size and capacity equipment $12,261 $82,000 $12,261
122,802
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $474 $1,400 $474
4,689
kWh
-
04 2.2511: Insulate bare equipment $582 $750 - $582
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $157 $720 $157
1,465
kWh
-
06 2.7144: Install spectral reflectors / delamp $245 $500 $245
2,345
kWh
-
07 2.7135: Install occupancy sensors $1,484 $2,520 $1,484
13,775
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $793 $114 $793
5,275
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $383 $280 $383
3,224
kWh
-
TOTAL RECOMMENDED $17,957 $92,184 $17,375
169,401
kWh
$582
-
MMBtu
TOTAL IMPLEMENTED $5,696 $10,184 $5,114
46,599
kWh
$582
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs