| Assessment Year | 2022 |
|---|---|
| Principal Product | Machined Parts |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 5 |
| Plant Area |
23,000
ft2
|
| Annual Production | 400,000
pieces
|
| Production Hrs. Annual | 6,708
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $67,663 | 533,060 |
kWh
|
$0.13 |
| Electricity Demand | $8,241 | 2,161 |
kW-mo/yr
|
$3.81 |
| Electricity Fees | $20,576 | - |
|
- |
| Natural Gas | $3,777 | 332 |
MMBtu
|
$11.38 |
| TOTAL YEARLY COSTS | $100,257 | |||
| RECOMMENDED SAVINGS* | $76,206 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $36,392 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8123: Pay utility bills on time | $671 | - | - | - | $671 | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,267 | $1,927 |
$6,897
54,309
kWh
|
$370
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,461 | $2,205 |
$6,187
48,718
kWh
|
$274
-
kW-mo/yr
|
- | - | |
| 04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $1,817 | $1,200 |
$1,817
14,310
kWh
|
- | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,717 | $1,900 |
$520
4,090
kWh
|
$1,197
-
kW-mo/yr
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,615 | $3,540 |
$1,531
12,054
kWh
|
$84
-
kW-mo/yr
|
- | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $728 | $1,800 |
$690
5,431
kWh
|
$38
-
kW-mo/yr
|
- | - | |
| 08 | 2.7232: Replace existing hvac unit with high efficiency model | $18,661 | $48,235 |
$17,891
140,868
kWh
|
$770
-
kW-mo/yr
|
- | - | |
| 09 | 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers | $37,269 | $125,000 | - | - | - | $37,269 | |
| TOTAL RECOMMENDED | $76,206 | $185,807 |
$35,533
279,780
kWh
|
$2,733
-
kW-mo/yr
|
$671 | $37,269 | ||
| TOTAL IMPLEMENTED | $36,392 | $57,807 |
$33,026
260,039
kWh
|
$2,695
-
kW-mo/yr
|
$671 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs