ITAC Assessment: IC0335
ITAC logo
ITAC Assessment: IC0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Copper Finn Tubes
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 120,000
ft2
Annual Production 24,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $484,015 6,065,123
kWh
Electricity Demand $138,021 11,429
kW-mo/yr
Electricity Fees $57,651 -
Natural Gas $17,156 6,278
MMBtu
TOTAL YEARLY COSTS $696,842
RECOMMENDED SAVINGS* $327,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.9114: Use solar heat to make electricty $128,644 $588,331 $67,636
845,456
kWh
$61,007
-
kW-mo/yr
-
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $132,338 $199,240 $97,695
872,277
kWh
$34,643
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $599 $1,500 $500
6,253
kWh
$98
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,411 $10,063 $5,312
66,400
kWh
$1,099
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $2,550 $760 $1,999
24,991
kWh
$551
-
kW-mo/yr
-
06 4.631: Install an uninteruptable power supply $49,315 $61,000 - - $49,315
07 2.4239: Eliminate or reduce compressed air usage $7,762 $15,500 $6,656
83,195
kWh
$1,106
-
kW-mo/yr
-
TOTAL RECOMMENDED $327,618 $876,394 $179,799
1,898,573
kWh
$98,504
-
kW-mo/yr
$49,315
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs