Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product copper wire
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $50
M
to 100
M
# of Employees 275
Plant Area 326,000
ft2
Annual Production 40,732,181
lb
Production Hrs. Annual 8,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $934,100 16,955,659
kWh
Electricity Demand $228,380 46,176
kW-mo/yr
Electricity Fees $65,107 -
Fuel Oil #4 $57,674 2,265
MMBtu
Other Gas $64,533 2,533
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,249 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $22,610 - $20,828
378,000
kWh
$1,782
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $22,134 - $22,134
401,732
kWh
- - - -
03 2.8121: Apply for tax-free status for energy purchases $3,172 - - - - - $3,172
04 2.4322: Use or replace with energy efficient substitutes $2,751 - $1,860
33,750
kWh
$891
-
kW-mo/yr
- - -
05 2.7224: Reduce space conditioning during non-working hours $1,359 - - - $1,359
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,708 $1,340 $17,708
321,385
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,620 $805 $367
6,657
kWh
$45
-
kW-mo/yr
- $900 $308
08 2.4133: Use most efficient type of electric motors $7,312 $14,040 $6,480
117,600
kWh
$832
-
kW-mo/yr
- - -
09 2.6211: Conserve energy by efficient use of vending machines $583 $1,743 $583
10,489
kWh
- - - -
TOTAL RECOMMENDED $79,249 $17,928 $69,960
1,269,613
kWh
$3,550
-
kW-mo/yr
$1,359
-
MMBtu
$900 $3,480
TOTAL IMPLEMENTED $49,220 $2,145 $40,763
739,792
kWh
$2,718
-
kW-mo/yr
$1,359
-
MMBtu
$900 $3,480
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs