ITAC Assessment: SU0583
ITAC logo
ITAC Assessment: SU0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Electrical Wire
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $100
M
to 500
M
# of Employees 156
Plant Area 78,000
ft2
Annual Production 15,200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $496,852 4,603,959
kWh
Electricity Demand $196,678 15,035
kW-mo/yr
Electricity Fees $28,804 -
Natural Gas $15,750 2,745
MMBtu
Other Gas $2,745 241
MMBtu
Other Energy $2,745 1,399
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $743,574
RECOMMENDED SAVINGS* $42,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $1,914 - $1,553
14,377
kWh
$361
-
kW-mo/yr
- - -
02 2.4239: Eliminate or reduce compressed air usage $6,650 - $6,650
61,578
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,856 $28 $1,856
17,184
kWh
- - - -
04 2.4322: Use or replace with energy efficient substitutes $1,190 $42 $778
7,200
kWh
$589
-
kW-mo/yr
$(-176.2)
-
MMBtu
- -
05 2.8121: Apply for tax-free status for energy purchases $1,399 $65 - - - - $1,399
06 2.4221: Install compressor air intakes in coolest locations $5,852 $1,031 $5,852
54,189
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,515 $16,180 $8,515
78,840
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,591 $8,145 $2,591
23,987
kWh
- - - -
09 2.7135: Install occupancy sensors $1,698 $5,771 $1,698
15,725
kWh
- - - -
10 2.8227: Adjust / maintain fork lift trucks for most efficient operation $11,245 $52,500 $(-2,897.9)
(-26,832)
kWh
- - $14,143
-
MMBtu
-
TOTAL RECOMMENDED $42,911 $83,762 $26,595
246,248
kWh
$950
-
kW-mo/yr
$(-176.2)
-
MMBtu
$14,143
-
MMBtu
$1,399
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs