ITAC Assessment: LE0349
ITAC logo
ITAC Assessment: LE0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Rolled Copper Strip
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 85,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $586,281 7,311,109
kWh
Electricity Demand $26,713 18,772
kW-mo/yr
Electricity Fees $1,232 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,018 $7,190 $1,779
22,239
kWh
$162
-
kW-mo/yr
- $77
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $85,383 $310,000 $169,703
2,121,293
kWh
$5,248
-
kW-mo/yr
$(-89,568.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,249 $40 $6,101
76,267
kWh
$148
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $1,253 $1,248 $1,230
15,374
kWh
$23
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,373 $1,080 $4,269
53,363
kWh
$104
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,052 $200 $1,008
12,601
kWh
$44
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,510 $12,700 $15,945
199,315
kWh
$565
-
kW-mo/yr
- -
08 2.4112: Install soft-start to eliminate nuisance trips $1,074 $5,200 - $1,074
-
kW-mo/yr
- -
TOTAL RECOMMENDED $117,912 $337,658 $200,035
2,500,452
kWh
$7,368
-
kW-mo/yr
$(-89,568.0) $77
TOTAL IMPLEMENTED $92,826 $318,470 $176,759
2,209,496
kWh
$5,558
-
kW-mo/yr
$(-89,568.0) $77
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs