Assessment Year | 2012 |
---|---|
Principal Product | Rolled Copper Strip |
NAICS | 331420: Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
Sales Range | $10 M to 50M |
# of Employees | 20 |
Plant Area |
85,000
ft2
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $586,281 | 7,311,109 |
kWh
|
$0.080 |
Electricity Demand | $26,713 | 18,772 |
kW-mo/yr
|
$1.42 |
Electricity Fees | $1,232 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $117,912 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $92,826 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,018 | $7,190 |
$1,779
22,239
kWh
|
$162
-
kW-mo/yr
|
- | $77 | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $85,383 | $310,000 |
$169,703
2,121,293
kWh
|
$5,248
-
kW-mo/yr
|
$(-89,568.0) | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,249 | $40 |
$6,101
76,267
kWh
|
$148
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,253 | $1,248 |
$1,230
15,374
kWh
|
$23
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,373 | $1,080 |
$4,269
53,363
kWh
|
$104
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,052 | $200 |
$1,008
12,601
kWh
|
$44
-
kW-mo/yr
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,510 | $12,700 |
$15,945
199,315
kWh
|
$565
-
kW-mo/yr
|
- | - | |
08 | 2.4112: Install soft-start to eliminate nuisance trips | $1,074 | $5,200 | - |
$1,074
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $117,912 | $337,658 |
$200,035
2,500,452
kWh
|
$7,368
-
kW-mo/yr
|
$(-89,568.0) | $77 | ||
TOTAL IMPLEMENTED | $92,826 | $318,470 |
$176,759
2,209,496
kWh
|
$5,558
-
kW-mo/yr
|
$(-89,568.0) | $77 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs