ITAC Assessment: UF0220
ITAC logo
ITAC Assessment: UF0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Bedroom Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 80,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 3,432
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,027 2,734,174
kWh
Electricity Demand $41,752 10,624
kW-mo/yr
Natural Gas $4,243 459
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,669

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,694 $4,040 $1,694
21,981
kWh
- - -
02 2.4133: Use most efficient type of electric motors $7,337 $24,229 $7,218
103,751
kWh
$119
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,038 $2,200 $4,038
65,358
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,096 - $1,096
14,361
kWh
- - -
05 2.6212: Turn off equipment during breaks, reduce operating time $1,510 $400 $1,510
24,326
kWh
- - -
06 3.5316: Contract a wood pallet recycling company $1,275 - - - $1,275
-
lb
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,948 $15,000 - - $6,948
-
lb
-
08 4.812: Apply for investment incentives $13,923 $50 - - - $13,923
TOTAL RECOMMENDED $37,821 $45,919 $15,556
229,777
kWh
$119
-
kW-mo/yr
$8,223
-
lb
$13,923
TOTAL IMPLEMENTED $27,669 $26,479 $12,352
183,470
kWh
$119
-
kW-mo/yr
$1,275
-
lb
$13,923
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs