Assessment Year | 1999 |
---|---|
Principal Product | Bedroom Furniture |
NAICS |
n/a
|
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
80,000
ft2
|
Annual Production | 120,000
pieces
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,027 | 2,734,174 |
kWh
|
$0.070 |
Electricity Demand | $41,752 | 10,624 |
kW-mo/yr
|
$3.93 |
Natural Gas | $4,243 | 459 |
MMBtu
|
$9.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,821 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,669 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,694 | $4,040 |
$1,694
21,981
kWh
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $7,337 | $24,229 |
$7,218
103,751
kWh
|
$119
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,038 | $2,200 |
$4,038
65,358
kWh
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,096 | - |
$1,096
14,361
kWh
|
- | - | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,510 | $400 |
$1,510
24,326
kWh
|
- | - | - | |
06 | 3.5316: Contract a wood pallet recycling company | $1,275 | - | - | - |
$1,275
-
lb
|
- | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,948 | $15,000 | - | - |
$6,948
-
lb
|
- | |
08 | 4.812: Apply for investment incentives | $13,923 | $50 | - | - | - | $13,923 | |
TOTAL RECOMMENDED | $37,821 | $45,919 |
$15,556
229,777
kWh
|
$119
-
kW-mo/yr
|
$8,223
-
lb
|
$13,923 | ||
TOTAL IMPLEMENTED | $27,669 | $26,479 |
$12,352
183,470
kWh
|
$119
-
kW-mo/yr
|
$1,275
-
lb
|
$13,923 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs