ITAC Assessment: CO0194
ITAC logo
ITAC Assessment: CO0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CANDIES
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 8,000,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $634,472 10,766,999
kWh
Natural Gas $283,251 49,734
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $54,836 $250 $37,880
-
kWh
$16,956
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $16,039 $2,000 - $16,039
-
MMBtu
03 2.4133: Use most efficient type of electric motors $2,678 $3,583 $2,678
48,359
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $677 $236 $677
12,309
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,498 $2,500 $1,498
26,964
kWh
-
06 2.2614: Use cooling tower or economizer to replace chiller cooling $3,030 $5,000 $3,030
54,807
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,242 $3,000 $1,242
22,567
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $417 $1,420 $417
7,620
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,749 $10,520 $2,749
49,531
kWh
-
TOTAL RECOMMENDED $83,166 $28,509 $50,171
222,157
kWh
$32,995
-
MMBtu
TOTAL IMPLEMENTED $76,145 $9,989 $43,150
95,252
kWh
$32,995
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs