ITAC Assessment: OR0120
ITAC logo
ITAC Assessment: OR0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STEEL CASTINGS
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 2,308,361
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,182 1,588,511
kWh
Natural Gas $28,374 6,132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,161 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $3,060 $2,900 - $3,060
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,938 $3,000 $2,938
75,322
kWh
-
03 2.3212: Optimize plant power factor $1,000 $1,425 $1,000
-
kWh
-
04 2.4133: Use most efficient type of electric motors $113 $226 $113
2,931
kWh
-
05 2.2511: Insulate bare equipment $50 $1,095 $50
2,052
kWh
-
TOTAL RECOMMENDED $7,161 $8,646 $4,101
80,305
kWh
$3,060
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs