ITAC Assessment: SU0607
ITAC logo
ITAC Assessment: SU0607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Copper Wire
NAICS 331420: Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $100
M
to 500
M
# of Employees 202
Plant Area 326,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,042,971 16,725,509
kWh
Electricity Demand $350,239 43,100
kW-mo/yr
Electricity Fees $12,338 -
LPG $199,085 13,434
MMBtu
Waste Disposal Costs
Water Usage $26,953 6,174
Tgal
TOTAL YEARLY COSTS $1,631,586
RECOMMENDED SAVINGS* $125,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,688 - $1,688
27,225
kWh
- - -
02 3.1161: Eliminate/reduce an operation $1,725 - $1,507
24,300
kWh
$1,755
-
kW-mo/yr
$(-1,536.8)
-
MMBtu
-
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $6,197 $1,433 $6,197
99,951
kWh
- - -
04 2.2136: Install / repair insulation on steam lines $4,677 $1,188 - - $4,677
-
MMBtu
-
05 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $10,934 $3,466 - - $10,934
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $941 $387 $941
15,185
kWh
- - -
07 2.4322: Use or replace with energy efficient substitutes $489 $708 $224
3,616
kWh
$40
-
kW-mo/yr
- $224
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,057 $1,985 - - $1,057
-
MMBtu
-
09 2.6211: Conserve energy by efficient use of vending machines $607 $1,271 $607
9,784
kWh
- - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,294 $5,655 $2,294
36,997
kWh
- - -
11 2.9114: Use solar heat to make electricty $2,174 $5,654 $2,174
35,064
kWh
- - -
12 2.1321: Replace fossil fuel equipment with electrical equipment $75,844 $285,000 $(-19,889.6)
(-320,800)
kWh
- $95,734
-
MMBtu
-
13 2.4321: Upgrade obsolete equipment $16,702 $117,000 $16,702
269,391
kWh
- - -
TOTAL RECOMMENDED $125,329 $423,748 $12,444
200,713
kWh
$1,795
-
kW-mo/yr
$110,865
-
MMBtu
$224
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs