Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,317

matching recommendations
$
$
ARC Operations
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0203 #01 Y:2024 Use automatic flow control $56,666 $700
UW2417 #01 Y:2024 Make a new by-product $17,325 $26,750
IP0201 #02 Y:2024 Change procedures / equipment / operating conditions $9,654 -
DL0243 #03 Y:2024 Eliminate/reduce an operation $2,346 $520
OR0797 #04 Y:2024 Change procedures / equipment / operating conditions $3,405 $16,073
IC0312 #06 Y:2024 Eliminate/reduce an operation $70,893 -
SU0557 #01 Y:2024 Change procedures / equipment / operating conditions $616 -
MUCM20 #06 Y:2024 Eliminate/reduce an operation $178 -
TT0313 #10 Y:2024 Change procedures / equipment / operating conditions $261,275 $200,000
UW2410 #07 Y:2024 Change procedures / equipment / operating conditions $1,810 $16,232
UU0248 #03 Y:2024 Use automatic flow control $820 $4,250
UU0246 #07 Y:2024 Use automatic flow control $4,727 $4,633
IP0180 #04 Y:2023 Use fog nozzles / spray rinsing instead of immersion rinsing $4,518 $5,490
AM0893 #01 Y:2023 Change procedures / equipment / operating conditions $70,280 $188,400
OR0781 #01 Y:2023 Eliminate/reduce an operation $112,997 $116,429
LS2319 #01 Y:2023 Use a different or recycled raw material $12,150 -
OR0779 #01 Y:2023 Eliminate/reduce an operation $3,315 -
MZ0352 #11 Y:2023 Use a different or recycled raw material $109,087 $116,979
AS0560 #01 Y:2023 Change procedures / equipment / operating conditions $701,165 $7,692,249
CM1021 #03 Y:2023 Change procedures / equipment / operating conditions $427 $730