ITAC Assessment: NT0059
ITAC logo
ITAC Assessment: NT0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aircraft wings
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $100
M
to 500
M
# of Employees 420
Plant Area 250,000
ft2
Annual Production 37
units
Production Hrs. Annual 6,912
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,780 4,565,250
kWh
Electricity Demand $110,742 9,745
kW-mo/yr
Electricity Fees $9,398 -
Natural Gas $41,434 914
MMBtu
Waste Disposal Costs
Water Usage $28,460 828
Tgal
TOTAL YEARLY COSTS $453,815
RECOMMENDED SAVINGS* $519,625 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 3.1191: Change procedures / equipment / operating conditions $151,111 $279,044 - - - $1,111
-
MMBtu
$150,000 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $48,097 $5,753 $35,861
620,435
kWh
$12,236
-
kW-mo/yr
- - - -
03 2.8121: Apply for tax-free status for energy purchases $37,639 $5,000 - - $37,639 - - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $36,000 $66,400 - - - - $36,000 -
05 2.7232: Replace existing hvac unit with high efficiency model $216,471 $827,008 $16,471
54,126
kWh
- - - $175,000 $25,000
06 3.8113: Prevent excessive solvent usage (operator training) $15,300 $900 - - - - $15,300 -
07 2.3212: Optimize plant power factor $10,008 $29,441 - - $10,008 - - -
08 2.7221: Lower temperature during the winter season and vice-versa $4,998 - $4,998
86,467
kWh
- - - - -
TOTAL RECOMMENDED $519,625 $1,213,546 $57,330
761,028
kWh
$12,236
-
kW-mo/yr
$47,647 $1,111
-
MMBtu
$376,300 $25,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs