ITAC Assessment: SU0441
ITAC logo
ITAC Assessment: SU0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Wire and Cable
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 144,000
ft2
Annual Production 108,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $615,775 15,887,583
kWh
Electricity Demand $408,025 67,213
kW-mo/yr
Electricity Fees $35,399 -
Natural Gas $51,751 10,960
MMBtu
Waste Disposal Costs
Water Usage $12,112 322,000
Tgal
TOTAL YEARLY COSTS $1,123,062
RECOMMENDED SAVINGS* $22,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,195 - $3,195
81,917
kWh
- - - -
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $10,649 $1,130 $10,649
273,059
kWh
- - - -
03 2.2437: Recover waste heat from equipment $3,779 $459 - - $3,779
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $3,408 $879 $3,408
87,379
kWh
- - - -
05 3.1161: Eliminate/reduce an operation $630 $762 $(-31.0)
(-786)
kWh
$(-546.0)
-
kW-mo/yr
- $446 $761
06 2.7314: Reduce ventilation air $448 $1,147 $152
3,905
kWh
- $296
-
MMBtu
- -
07 2.6211: Conserve energy by efficient use of vending machines $299 $916 $299
7,664
kWh
- - - -
TOTAL RECOMMENDED $22,408 $5,293 $17,672
453,138
kWh
$(-546.0)
-
kW-mo/yr
$4,075
-
MMBtu
$446 $761
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs