ITAC Assessment: GT0870
ITAC logo
ITAC Assessment: GT0870
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product 100% Cotton Yarn
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 198,000
ft2
Annual Production 42,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,915,366 27,362,370
kWh
Electricity Demand $137,131 43,943
kW-mo/yr
Electricity Fees $118,094 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.3132: Recharge batteries on during off-peak demand periods $625 - - $625
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,570 $1,000 $4,570
65,260
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,245 $20,050 $9,245
132,075
kWh
-
04 2.7135: Install occupancy sensors $5,810 $620 $5,810
83,003
kWh
-
05 2.4314: Use synthetic lubricant $43,210 - $43,210
617,350
kWh
-
06 2.7242: Change zone reheat coils to variable air volume boxes $1,500 $6,399 $1,500
21,455
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $33,910 $45,000 $33,910
484,400
kWh
-
08 2.2437: Recover waste heat from equipment $4,796 $7,656 $4,796
68,520
kWh
-
TOTAL RECOMMENDED $103,666 $80,725 $103,041
1,472,063
kWh
$625
TOTAL IMPLEMENTED $94,300 $72,069 $93,675
1,338,283
kWh
$625
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs