| Assessment Year | 2009 |
|---|---|
| Principal Product | 100% Cotton Yarn |
| NAICS | 313110: Fiber, Yarn, and Thread Mills |
| SIC | 2281: Yarn Spinning Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 94 |
| Plant Area |
198,000
ft2
|
| Annual Production | 42,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,915,366 | 27,362,370 |
kWh
|
$0.070 |
| Electricity Demand | $137,131 | 43,943 |
kW-mo/yr
|
$3.12 |
| Electricity Fees | $118,094 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $103,666 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $94,300 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3132: Recharge batteries on during off-peak demand periods | $625 | - | - | $625 | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,570 | $1,000 |
$4,570
65,260
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,245 | $20,050 |
$9,245
132,075
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $5,810 | $620 |
$5,810
83,003
kWh
|
- | |
| 05 | 2.4314: Use synthetic lubricant | $43,210 | - |
$43,210
617,350
kWh
|
- | |
| 06 | 2.7242: Change zone reheat coils to variable air volume boxes | $1,500 | $6,399 |
$1,500
21,455
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $33,910 | $45,000 |
$33,910
484,400
kWh
|
- | |
| 08 | 2.2437: Recover waste heat from equipment | $4,796 | $7,656 |
$4,796
68,520
kWh
|
- | |
| TOTAL RECOMMENDED | $103,666 | $80,725 |
$103,041
1,472,063
kWh
|
$625 | ||
| TOTAL IMPLEMENTED | $94,300 | $72,069 |
$93,675
1,338,283
kWh
|
$625 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs