ITAC Assessment: OK0461
ITAC logo
ITAC Assessment: OK0461
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Central vacuum systems, bathroom cabinets, intercoms
NAICS
n/a
SIC 3635: Household Vacuum Cleaners
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 175,000
ft2
Annual Production 41,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,632 522,861
kWh
Natural Gas $19,032 5,699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,455 $19,000 $9,235
124,853
kWh
$(-1,780.0)
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,046 $120 $1,046
16,120
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $993 $437 $993
14,361
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $257 - $257
3,517
kWh
-
05 2.2437: Recover waste heat from equipment $127 $201 - $127
-
MMBtu
TOTAL RECOMMENDED $9,878 $19,758 $11,531
158,851
kWh
$(-1,653.0)
-
MMBtu
TOTAL IMPLEMENTED $2,039 $557 $2,039
30,481
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs