ITAC Assessment: NC0186
ITAC logo
ITAC Assessment: NC0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Glass vials
NAICS
n/a
SIC 3221: Glass Containers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 106,400
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,756 4,342,614
kWh
Electricity Demand $66,915 9,008
kW-mo/yr
Natural Gas $154,022 40,431
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,321

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,878 $20 $1,352
35,756
kWh
$526
-
kW-mo/yr
- -
02 2.2491: Use cooling air which cools hot work pieces for space heating $3,993 $6,400 - - $3,993
-
MMBtu
-
03 2.2515: Use optimum thickness insulation $9,327 $32,175 - - $9,327
-
MMBtu
-
04 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $12,321 $4,000 $9,058
239,156
kWh
$3,263
-
kW-mo/yr
- -
05 3.5313: Increase amount of waste recovered for resale $1,150 $200 - - - $1,150
-
lb
TOTAL RECOMMENDED $28,669 $42,795 $10,410
274,912
kWh
$3,789
-
kW-mo/yr
$13,320
-
MMBtu
$1,150
-
lb
TOTAL IMPLEMENTED $12,321 $4,000 $9,058
239,156
kWh
$3,263
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs