ITAC Assessment: LE0299
ITAC logo
ITAC Assessment: LE0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product year books
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 3991: Brooms and Brushes
Sales Range $50
M
to 100
M
# of Employees 365
Plant Area 68,000
ft2
Annual Production 6,700
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,980 4,213,699
kWh
Electricity Demand $111,886 8,563
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,651 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,532

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $29,292 $375,000 $7,991
257,799
kWh
- $21,301 -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,307 $18,000 $20,172
650,720
kWh
$14,135
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $10,520 $66,360 $6,662
214,905
kWh
$3,858
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,599 $3,000 - $5,599
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $1,849 $800 $1,051
33,916
kWh
$798
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,703 $800 $5,111
164,903
kWh
$3,592
-
kW-mo/yr
- -
07 2.7261: Install timers and/or thermostats $697 $150 $697
22,530
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,684 $13,847 $1,434
46,260
kWh
$1,008
-
kW-mo/yr
- $242
TOTAL RECOMMENDED $93,651 $477,957 $43,118
1,391,033
kWh
$28,990
-
kW-mo/yr
$21,301 $242
TOTAL IMPLEMENTED $19,532 $18,597 $8,293
267,609
kWh
$10,997
-
kW-mo/yr
- $242
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs