ITAC Assessment: MS0096
ITAC logo
ITAC Assessment: MS0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Rubber Hose
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area 52,500
ft2
Annual Production 13,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,841 3,615,768
kWh
Electricity Demand $26,019 9,606
kW-mo/yr
Electricity Fees $49,452 -
Natural Gas $89,034 20,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $382,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,195 $7,228 $2,134
44,842
kWh
$374
-
kW-mo/yr
$687 - -
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $13,603 $17,448 $10,983
230,070
kWh
- $2,620 - -
03 3.8142: Distill contaminated solvents for reuse $19,264 $5,738 - - - $19,264
-
gal
-
04 4.431: Train operators for maximum operating efficiency $346,828 $10,000 - - - - $346,828
TOTAL RECOMMENDED $382,890 $40,414 $13,117
274,912
kWh
$374
-
kW-mo/yr
$3,307 $19,264
-
gal
$346,828
TOTAL IMPLEMENTED $36,062 $30,414 $13,117
274,912
kWh
$374
-
kW-mo/yr
$3,307 $19,264
-
gal
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs